Owner’s engineer for a brownfield new-build project at the CCGT CHP Plant Ljubljana
Overview
Installation of two gas turbines including heat recovery steam generators with a capacity of approx. 50 MW each. The new plant supplies the existing steam turbine and the district heating system with process steam.
Services of VPC at a glance